1-RT Power System 10- Months (10 April 2015 to 7 Feb2016)
Worked as an Electrical Engineer
Core of competencies:
a) Generators(16-KVA to 500-KVA)
b) ATS (Automatic transfer switch)panels ,Generator module and engine wiring, generator electromechanical maintenance
c) Scheduled maintenance and file record
d) Technical assistance to senior and juniors
2-SPEL technology support (Pvt) Ltd 1-Year 10 Month (25 June 2013 to 4 April 2015)
Worked as an Electrical Supervisor
Core of competencies:
a) Installed and commissioned different solar energy system (Off grid, On-grid and Hybrid) at different sites Pak Suzuki, Millat Tractor, Chugtae Lab, Shaan Ghee,, Doctors hospital etc. 1-KW to 100-KW domestic and commercial level projects.
b) Quality assurance, quality control, project planning and management, operation management, performance analysis, market research.
3-State Life Housing Society 3- years 6 month (8 May 2008 to 04 November 2011)
Worked as an Electrical Supervisor
Core of competencies:
a) All society roads, offices, buildings, plazas, and power houses handled electricity matters & troubles.
b) 10-KVAto 250-KVA generators work and trouble shoot
c) Worked on ATS panels, AVR, EFC, Modules, ACB, Phase failure relays, D.O.L, Star delta circuits, L.T panels, single phase, three
Phase wiring, KWH meter installed.
d) Technical staff supervision and Senior staff assistance.
4-Pak Electron Limited (PEL) 1 Sep 2006 to 29 Sep 2006
As a trainee (Transformer section)
Learned about Transformer operation, functional testing and manufacturing 10-KVA to 600-KVA.
Working as a Sales and Procurement Engineer